• Skip to primary navigation
  • Skip to main content

Siena Condo

  • Home
  • General Info
    • Photo Gallery
    • News
    • Rules & Regulations
    • Hurricane Preparedness
    • Forms
    • Siena Events
    • Gate Registration
  • Resident Login
    • Login
    • Register

August 30, 2024

1st Floor Walkway Repainting – Sep. 3, 2024

1st Floor Walkway Repainting
Tuesday, September 3

Repainting will begin in Building 1 at around 9am. Each building will take about 90 minutes. 1st Floor Residents, please exit/enter through your lanai.

The paint dries in about 45 minutes; please don’t walk on wet paint!

Filed Under: Archives

Powered by Magratech · Copyright © 2025 · Log in